자력 선별 장비 및 맞춤형 자석 솔루션
OSENC 자력 선별 장비 추천 요청

DRUM-HOUSED-001 – APPLICATION-ENGINEERED EQUIPMENT

하우징형 드럼 자력선별기

A housed magnetic drum separator must be selected around the actual material path, feed presentation, target ferrous fraction, discharge layout and acceptance method. This Pilot publishes the engineering boundary clearly and leaves unverified specifications open.

Housed magnetic drum separator in an industrial separation installation

EntityDRUM-HOUSED-001

EquipmentHoused magnetic drum separator

Fact statusEntity facts limited to verified public records

Selection statusProject inputs required before configuration

PROCESS / MATERIAL FIT

Fit is confirmed from the feed, not the product name

The housed format does not establish suitability by itself. Engineering review starts with how the material arrives at the separation point and how the captured and non-captured fractions must leave it.

원료 상태

Confirm material identity, process state, particle-size distribution, flowability, moisture or slurry condition where applicable, bulk density and temperature.

Separation objective

Define the target ferrous material, size, shape and concentration, then state whether the duty is equipment protection, purification, recovery or another controlled objective.

Stable presentation

Provide feed method, usable width, normal layer depth, surging risk and normal/peak feed conditions. Unstable presentation cannot be corrected by a nominal drum specification.

FIELD FACT BINDING

Published operating window

No numerical operating window is controlled for this entity. The table records what remains OPEN and prevents family or peer data from being presented as this product’s specification.

Engineering input Current published status Required for review
Processed material and process state OPEN Material identity, dry/wet condition, flow behavior and temperature
Particle-size range and largest lump OPEN Normal distribution plus maximum piece size
Normal and peak throughput OPEN Feed rate together with bulk density and operating cycle
원료 공급 상태 OPEN Inlet method, usable feed width, layer depth and stability
Target ferrous fraction OPEN Material, size, shape, concentration and separation objective
Drum and discharge interface OPEN Available envelope, splitter route, chutes and maintenance clearance
검수 방법 OPEN Sampling method, test conditions and acceptance criterion

MAGNETIC PERFORMANCE BOUNDARY

Field strength is not separation performance

No capacity, surface-field, capture-size, removal, recovery, purity, working-distance or pull-force value is published for this entity without a controlled test scope.

Performance category Publication status 적용 한계
자기장 세기 No controlled value published Requires measurement location, gap, instrument, probe orientation and temperature.
Pull-force result No controlled value published Requires test piece, contact or gap, direction, method and repeat logic.
Process separation result No controlled value published Requires representative feed, contaminant definition, settings, sampling and mass balance.

DRUM / FEED / DISCHARGE / DRIVE / INSTALLATION

Interfaces that define the final configuration

Drum and magnetic circuit

Confirm drum geometry, working width, magnetic arc, working gap and field-test method. Magnet grade alone does not define the finished assembly.

Feed and splitter

Confirm inlet geometry, feed distribution, layer depth, splitter position and separate discharge routes for the product and captured fraction.

Drive and rotating interface

Confirm duty cycle, drive arrangement, required speed window, shaft and bearing interfaces, guarding and controls before a drive is selected.

Contact and wear surfaces

Confirm which surfaces contact the process material, abrasion or corrosion exposure, liner requirements, finish and cleaning method. No material grade is assumed.

설치

Provide inlet/outlet coordinates, support points, available envelope, access for inspection and cleaning, utilities and surrounding equipment constraints.

Acceptance

Agree the measured variable, representative material, sampling plan, operating conditions and acceptance criterion before performance is committed.

EVIDENCE

Entity-page reference images

These images are retained from the current entity page as public configuration references. They are not dimensional drawings, inspection records or magnetic-performance evidence.

ENGINEERING RFQ

Define the separation duty before selecting the drum

Prepare the actual operating conditions for engineering review. The staging worksheet does not create a performance guarantee.

Continue to contact form

This staging worksheet does not transmit field values. Final RFQ submission routing remains subject to human review.